Sunday, September 30, 2012
Case Study
Studying cases allows for obtaining an in-depth understanding (through explaining, exploring, and describing) of complex social phenomena, while retaining the holistic and meaningful characteristics of real-life events (Yin 1994).
KOHLBACHER, F.. The Use of Qualitative Content Analysis in Case Study Research. Forum Qualitative Sozialforschung / Forum: Qualitative Social Research, North America, 7, jan. 2006. Available at: <http://www.qualitative-research.net/index.php/fqs/article/view/75/153>. Date accessed: 01 Oct. 2012.
Abstract: This paper aims at exploring and discussing the possibilities of applying qualitative content analysis as a (text) interpretation method in case study research. First, case study research as a research strategy within qualitative social research is briefly presented. Then, a basic introduction to (qualitative) content analysis as an interpretation method for qualitative interviews and other data material is given. Finally the use of qualitative content analysis for developing case studies is examined and evaluated. The author argues in favor of both case study research as a research strategy and qualitative content analysis as a method of examination of data material and seeks to encourage the integration of qualitative content analysis into the data analysis in case study research.
Meta-evaluation of methods for selecting projects
Brandon,
Paul R. “A Meta-evaluation of Schools’ Methods for Selecting Site-managed
Projects.” Studies In Educational
Evaluation 24, no. 3 (1998): 213–228.
A meta-evaluation of 17 schools who apply for funding from a state-wide initiative. The authors were interested in finding out how the schools evaluated which projects were put forward for funding application.
There are three types of evaluative efforts required by schools, needs assessment; project evaluation (when searching for the one to best meet the student and school needs); and summative and formative evaluation after project implementation. This study investigates the second type ie school based evaluative efforts and activities used when selecting educational projects to address their identified needs.
The results showed that the extent to which teachers participated in making decisions about both the process and content of needs assessments was positively related to the validity of these decisions. (p.214)
Evaluation criteria came from using the CIPP approach to evaluation (Stufflebeam, 1983). The four criteria are (a) the extent to which all faculty and staff participated in selecting projects, (b) the extent to which school personnel used the appropriate sources of information, (c) the extent to which the schools compared their preferred projects with other available projects before making their final project selections, and (d) the extent to which the schools considered issues of feasibility such as project cost and ease of implementation. (p.216). A fifth criterion was used, based on the belief that projects are most likely to succeed when they are based on theories of education and have been shown to have succeeded elsewhere (Ellis & Fouts, 1993; Slavin, Karweit, & Madden, 1989). These five criteria then supported the five evaluation questions to be asked: (a) To what extent did school personnel participate in project selection? (b) To what extent did the schools collect information about possible projects from the appropriate types of sources? (c) To what extent did the schools compare their preferred projects with others before making final project selections? (d) To what extent did the schools consider project cost and ease of implementation when selecting projects? (e) To what extent were the selected projects based on theory and supported by empirical findings of previous studies? (p.218)
Two data collection methods were used, a self-report survey questionnaire (for first four questions) and a literature review (for fifth question). Findings: results were encouraging for two of the questions (b and c) and not so encouraging for the remaining three (a, d and e). Three categories of problems that the schools had encountered when implementing their projects were identified.
- inaccurate estimates of project costs.
- misjudging the managerial, administrative, or logistical requirements of the projects.
- underestimating the level of staff, parent, or community understanding or~motivation required for successful project implementation.
[useful when writing about my findings from Phase 1]
And the final question highlighted that empirical evidence about project success was not found for about half of the schools. This could be explained because school personnel often know little about proper use of research findings and this should not be the case with HE project proposals.
And Selecting projects is a task that is added to schools' full schedules, and, typically, few faculty and staff are available or willing to participate. [same could be said of HE] However authors recommend that schools should be shown the advantages of allowing as many of their staff and faculty as feasible to participate in project selection. Assistance of this sort would improve the chance that the best projects would be identified to meet needs and would help ensure that project funding is well spent.
An evaluation framework for sustaining the impact of educational development
Hashimoto, Kazuaki, Hitendra Pillay, and Peter Hudson. “An Evaluation Framework for Sustaining the Impact of Educational Development.” Studies In Educational Evaluation 36, no. 3 (2010) 101–110.
The context of this paper is international aid agencies funding of educational development projects in recipient countries and their apparent ineffectiveness. The authors were interested in overcoming donor agencies internal compliance requirements by looking how local evaluation capacity could be developed and also how developments could continue to be sustained after project completion. Although this context is not applicable to the HE sphere, the same could be said of external funding agents vs internal projects.
The authors define process evaluation (quote: DAC Network on Development Evaluation. (2008). Evaluating development cooperation. OECD DAC Network on Development Evaluation. Retrieved January 6, 2010, from http://www.oecd.org/dataoecd/3/56/41069878.pdf.) And state the importance of process evaluation being the involvement of the participants in making decisions on a project such as terminating a project if necessary (p.102.). The authors quote Miyoshi and Stemming (2008) in that most studies on evaluation with participatory approaches are not underpinned by evaluation theories but are method-oriented.
So an Egyptian project was used as a case study (see previous post) and there were two research questions: (1) how can an entire educational development project be evaluated? and (2) how can the capacity development in educational reform be evaluated? Participants included six different groups of stakeholders: funding body, local admin, researchers, teachers, parents and students. The analytic technique used was pattern matching (Yin, 2003, p. 116) to enhance its internal validity. There were three emergent themes to the study, context, outcome and process evaluation.
Outcome evaluation:
- assessing outcomes is necessary for determining the success of an educational reform project.
- Outcome evaluation should include local participant involve- ment for evaluating a project since they are the end users.
- Local stakeholders should not be seen as informants or discussants but rather as evaluators working jointly with aid agencies so they can appreciate the success and failure of achieving the objectives.
- Results supported the use of an external evaluator who in collaboration with the internal evaluators of the project can undertake a macro level evaluation of the project
Context Evaluation
- context evaluation assesses local needs and problems to be addressed, cultural, political and financial issues, assists to design a project and sets objectives before the initiation of an educational project.
- more local stakeholders such as representatives of local community are needed to join the evaluation to make their voice heard because after all they are the beneficiaries.
- This engagement of various stakeholders in dialogues throughout the project from the project design phase may enable their opinions and interests to be considered for designing and implementing a more effective project (House & Howe, 2000).
Process evaluation
- There was a need for adopting a systematic participatory evaluation approach involving individuals and groups at the different levels of an educational system, which was central to process evaluation.
- the linchpin of a sound process evaluation is employing skilled people
- the practice and culture of process evaluation should be nurtured during the life of educational projects and be institutionalized locally. This has the potential to sustain the impact of projects.
Conclusion - conventional monitoring and evaluation practices do not have the ability to sustain a project beyond its lifetime. And that 'paradigms should shift from outcome-focused evaluation currently dominated by international donor agencies to process evaluation conducted largely by local participants but also supported by donor agencies. ' (p109)
Framework outlined in picture below (from p.108):
Other articles that follows this line of thinking:
Donnelly, John. Maximising participation in international community-level project evaluation: a strength-based approach. [online]. Evaluation Journal of Australasia, v.10, no.2, 2010: 43-50. Availability:<http://search.informit.com.au/fullText;dn=201104982;res=APAFT> ISSN: 1035-719X. [cited 01 Oct 12].
Challenging times for evaluation of international development assistance
M Nagao - Evaluation Journal of Australasia, 2006 - aes.asn.au
Saturday, September 29, 2012
Case study methodology
Hashimoto, Pillay, and Hudson, (2010) “An Evaluation Framework for Sustaining the Impact of Educational Development.”
p.103 This study adopted a case-study methodology as it can be separated out for research in terms of time, place, or some physical boundaries (Creswell, 2008). Separating the case was critical as there are ongoing education reform projects happening in Egypt. The procedure was guided by Yin’s (2003) model with the sequenced five steps. These steps were: (i) developing research questions; (ii) identifying the research assumptions; (iii) specify- ing research unit(s) of analysis; (iv) the logical linking of data to the assumptions; and (v) determining the criteria and interpreting the findings. The case study is convenient to illuminate the contextually-embedded evaluation process using multiple data sources. This study used three data sources to triangulate the data. They were: (i) the JICA evaluation reports on the project, (ii) a survey questionnaire, and (iii) interviews with stakeholders. To unravel the two main research questions, the following three sub-research questions were applied to these three data sources: (1) Who should be involved in the evaluation process? (2) When should the evaluation be conducted? (3) Why should the evaluation be conducted? These three questions provides a holistic understand- ing of the key players involved in making decisions, the rationale for the timing of the evaluation activities (investigates the assumption underpinning such timing) and, the justification of the evaluation actions. Such a holistic approach is consistent with Burns (2000) argument that case studies should consider constructs from multiple perspectives in order to develop a deeper and more complete understanding of the constructs.
p.103 This study adopted a case-study methodology as it can be separated out for research in terms of time, place, or some physical boundaries (Creswell, 2008). Separating the case was critical as there are ongoing education reform projects happening in Egypt. The procedure was guided by Yin’s (2003) model with the sequenced five steps. These steps were: (i) developing research questions; (ii) identifying the research assumptions; (iii) specify- ing research unit(s) of analysis; (iv) the logical linking of data to the assumptions; and (v) determining the criteria and interpreting the findings. The case study is convenient to illuminate the contextually-embedded evaluation process using multiple data sources. This study used three data sources to triangulate the data. They were: (i) the JICA evaluation reports on the project, (ii) a survey questionnaire, and (iii) interviews with stakeholders. To unravel the two main research questions, the following three sub-research questions were applied to these three data sources: (1) Who should be involved in the evaluation process? (2) When should the evaluation be conducted? (3) Why should the evaluation be conducted? These three questions provides a holistic understand- ing of the key players involved in making decisions, the rationale for the timing of the evaluation activities (investigates the assumption underpinning such timing) and, the justification of the evaluation actions. Such a holistic approach is consistent with Burns (2000) argument that case studies should consider constructs from multiple perspectives in order to develop a deeper and more complete understanding of the constructs.
Saturday, August 25, 2012
Effective Dissemination
Deborah Southwell, Deanne Gannaway, Janice Orrell, Denise Chalmers & Catherine Abraham (2010): Strategies for effective dissemination of the outcomes of teaching and learning projects, Journal of Higher Education Policy and Management, 32:1, 55-67http://dx.doi.org/10.1080/13600800903440550
Came across this article and found some useful information in it, and its related ALTC (2005) report with same name. The report has been reviewed in 2011 and is now in the OLT repository, here.
Summary:
The paper looks at a range of Australian and International funding bodies who support L&T projects and asks the question 'How can a national institute for Learning and teaching in higher education maximise the likelihood of achieving large-scale change in teaching and learning across the Australian higher education sector, especially thorough its grants program and resource repository and clearing house?'(p.58)
Now whilst this covers national schemes, there are some important findings that could be applied to smaller scale projects and schemes such as the one I'm looking at and there are also some interesting findings on evaluation. Furthermore the ALTC report identifies some other international funding bodies which i could follow up on in terms of evaluation requirements etc.
Questions from the guiding framework of the project team are included and a couple would be relevant to my study:
What are the influences on and factors affecting a teacher's decision to make use of a project pr process that is being scaled up? What local and external factors facilitate or create barriers affecting the teachers decisions? What is the relationship between the development of local capacity and the quality of external reform structures? (p.59)
The projects which were selected came from a range of locations ut focussed more on projects that sought to change teaching and learning processes, practices and beliefs rather than on projects that focussed on developing products. (p60.)
Some Findings:
Two items of note were:
1. Initiation of an innovation - Intended users of an innovation need to be engaged very early int he planning stages of the innovation in an endeavour to ensure adoption and take up of ideas later on.(p.61) This can be extrapolated to my project in terms of getting stakeholders involved from the early stages and to getting uptake of evaluation findings.
2. Implementation, embedding and upscaling of innovation - one influence on this comes from the personal conception of teaching (p.62). I'm suggesting that the same is true for evaluation. Also, Academics with teaching qualifications appear to be more open to investigation of alternate curriculum and teaching approaches. (Lueddeke, 2003). It would be interesting to test and see if this is the case with evaluation ie does the qualified teacher value evaluation mechanisms more and therefore employ them in the projects in comparison with academics without teaching quals. and if this is the case is that because they have been 'taught' evaluation methods and skills and therefore their conception is different?
Conditions for successful dissemination:
- effective, multi-level leadership & management
- climate of readiness for change
- availability of resources
- comprehensive systems in institutions and funding bodies
- funding design
This last point is of interest - it mentions that expectations about the approaches to projects and activities that ought to be adopted are taken from the funding design. so i could say that if there is no real expectation of evaluation requirements then of course the project applicants are not going to be that stringent. - can link to this in the analysis of phase one.
One final mention in the conclusion (p.65) says 'An important aspect of this study was to identify abd to recommend that learning and teaching grant recipients must be supported and provided with access to experts in educational innovation and evaluation.'
The 2005 Carrick report goes into much more detail and evaluation is mentioned throughout. It also gives recommended strategies for each of the 5 'conditions', at the national, institution and discipline level. when i read through look like they were all implemented at MQ ie recommending standard requirements for application, including description of which evaluation strategies will be used.
FOr item 3, the report recommends providing project teams with access to specialist expertise - this could be for evaluation or at the least evaluation resources. Findings on p.55 state that 'those responsible for the project may require assistance in designing an appropriate evaluation process'.also info on this on page 45 (emerging themes)
For item 4 it mentions that support for quality processes, particularly monitoring and evaluation ought to be supplied. Also that evaluation is reported within an evaluation framework. Also, on p.58 there are findings that state that institutions that allocated funders AFTER the projects were finished were evaluated well and regularly and were eventually embedded within an institution. 'Generally, however, experiences quoted int he literature and in case studies evidenced poor quality of evaluation if done at all.' It then went on to explain that frequently dissemination across institutions occurred before it was apparent that there was any value or improvement instudent learning and therefore impact analysis was vital.
The 2011 review of this project didn't seem to add much more in regards to Evaluation other than a recommendation that external evaluation reports be provided publicly. There was a reference to Dow (2008) which i should follow up and could provide some useful data.
An evaluation of the Australia Learning and Teaching Council 2005-2008. Sydney: Australian Learning and Teaching Council.
What can be evaluated?
The following excerpt is taken from: Johannessen, E.M. (2001). Guidelines for evaluation of education projects in emergency situations. The Norwegian Refugee Council. http://toolkit.ineesite.org/toolkit/INEEcms/uploads/1039/Guidelines_for_Evaluation_of_Educ_Projects.PDF
I think it will be useful in the next paper when I'm analysing the themes and relating them back to the literature.
The following excerpt is from p12. The author uses the terminology 'Terms of Reference' (ToR) to describe to evaluation plan. This is in line with other articles and will fit into the paper on lit review/gaps in the lit.
5 WHAT CAN BE EVALUATED?
It is common in many evaluations to focus on the OECD criteria: relevance and fulfillment of objectives, development efficiency, effectiveness, impact and sustainability. Relevance refers to whether the project addresses the needs of the beneficiaries, efficiency to how productively the resources have been used while effectiveness relates to whether the objectives of the project were achieved. Impact is the long-term effect while sustainability relates to the maintenance of the changes after the project or program has been terminated (Dale 1998, Lewin 1993, Samset 1993). Sida adds "lessons learned" to the criteria which refer to important general experience the evaluation has yielded. All or some of the criteria are commonly addressed in evaluations of education projects although the terms may be used differently.
Although the concepts seem relevant and reasonable, there are several problems associated
with them. First of all, they need to be defined and specified in terms of identifiable activities when the project is being planned. This is often not the case. Secondly, the concepts "relevance", "impact" and "sustainability" may be difficult to investigate. The project may have been going on for a too short period and/or there is not enough time available to find answers to this type of questions. Another objection is that the OECD concepts are related to final products and not to description of the processes that have taken place. No projects/programs, whether in research or evaluations, develop neatly in a linear way. The description of the project and the steps we plan in the beginning are always transformed as they are being implemented. Major decisions regarding adjustments and turning points should be described and justified and be part of the evaluation.
I think it will be useful in the next paper when I'm analysing the themes and relating them back to the literature.
The following excerpt is from p12. The author uses the terminology 'Terms of Reference' (ToR) to describe to evaluation plan. This is in line with other articles and will fit into the paper on lit review/gaps in the lit.
Often the terms of reference are too vast and ambitious taken the time and resources intoAnd again on p18:
consideration. Sometimes questions and topics are suggested that are not possible to answer, at least not within the limited time available. As a result the evaluators know already before they start working that it is not feasible to follow the ToR
8 WHEN TO EVALUATE
Ideally the planning of an evaluation should start parallel with the activities/project. But more
often the opposite is the case; the coordinators start too think about evaluation when the
project is concluded or about to finish.
Saturday, August 18, 2012
More thoughts on phase 1 interviews
I've been reading through each of the interviews and marking up the themes that I have and I've come across another theme that is partially related to evaluation but also related to grants and projects.
It seems that more than a few people I interviewed complained about the fact that even though their project created or produced some wonderful outputs, not everyone was willing to take up these new ideas. For example redesign of some units into online units with chunking up of content meant that there were now more opportunities to interact with the material but the students felt this was too much work and the tutors felt this was too much work (marking). This kind of leads then to the point that if you don't fully involve your stakeholders then the project outcomes can't really meet their needs.
On the other hand another participant talked about this and said that there has to be a balance because when you try to please all of the stakeholders in this way you end up with a substandard product ie you 'dumb it down' to keep everyone happy and some of those novel and 'out there' ideas are lost in translation. This participant said that often it is a case of good timing. If no one takes up your new idea/product as you intended then it may because they are just not ready yet.
That then in turn leads to the conclusion i keep coming back to that evaluation has to be done later down the track (as well as formative and summative in the terms of the project). Often it is too early to say whether this project has been successful or not. You can say whether you met your outcomes or not but you cannot say whether those outcomes have had impact. Neither do people report what didn't work or rather why they may not be being taken up.
I think perhaps also there is some confusion between steering groups and stakeholders. A steering group may well reign you in, but stakeholders will be sure to tell you what they want and why/how they want it. Its one thing to listen to their needs then made an informed decision on how you are going to design your product (say). It is another to present it to a steering group because then you pretty much have to make the changes they request.
It seems that more than a few people I interviewed complained about the fact that even though their project created or produced some wonderful outputs, not everyone was willing to take up these new ideas. For example redesign of some units into online units with chunking up of content meant that there were now more opportunities to interact with the material but the students felt this was too much work and the tutors felt this was too much work (marking). This kind of leads then to the point that if you don't fully involve your stakeholders then the project outcomes can't really meet their needs.
On the other hand another participant talked about this and said that there has to be a balance because when you try to please all of the stakeholders in this way you end up with a substandard product ie you 'dumb it down' to keep everyone happy and some of those novel and 'out there' ideas are lost in translation. This participant said that often it is a case of good timing. If no one takes up your new idea/product as you intended then it may because they are just not ready yet.
That then in turn leads to the conclusion i keep coming back to that evaluation has to be done later down the track (as well as formative and summative in the terms of the project). Often it is too early to say whether this project has been successful or not. You can say whether you met your outcomes or not but you cannot say whether those outcomes have had impact. Neither do people report what didn't work or rather why they may not be being taken up.
I think perhaps also there is some confusion between steering groups and stakeholders. A steering group may well reign you in, but stakeholders will be sure to tell you what they want and why/how they want it. Its one thing to listen to their needs then made an informed decision on how you are going to design your product (say). It is another to present it to a steering group because then you pretty much have to make the changes they request.